Drinking Water Treatment Process
March 16, 2015What does it take to turn lake water or stormwater into drinking water? Discover the six processes every gallon of water must go through before it ...
Read Full Article
Wastewater Treatment Process
March 16, 2015What happens to all of the water that flushes down our sewers and drains? What steps are taken to clean it before it’s released back into the ...
Read Full Article
Tube Settler Coverage in a Circular Clarifier
April 13, 2015Tube settler coverage is the minimum required area tube settlers must cover to obtain the desired treatment. By nature of the shape, the calculations ...
Read Full Article
SedVac Flow Rate
May 18, 2015We often are asked about SedVac’s discharge flow rate during the course of working with consultants and operators on the sludge removal equipment ...
Read Full Article
Can trickling filters be used in a BNR process?
July 21, 2015Nitrogen and phosphorus are nutrients in a wastewater treatment system. A Biological Nutrient Removal (BNR) process removes either portions of the ...
Read Full Article
Submerged Fixed Film Technology: AccuFAS vs. MBBR vs. Fabric
July 29, 2015We’re often asked how our AccuFAS system compares to other submerged fixed-film systems, such as MBBR and fabric media. To answer such ...
Read Full Article
Submerged Fixed Film: Top 5 Considerations for Evaluating Different Systems
April 19, 2016Submerged fixed-film systems are ideal for significantly increasing nitrification in existing wastewater treatment plants. A well-designed and ...
Read Full Article
Fixed vs. Moving Bed Systems: Basin Geometry
April 26, 2016Aeration basins can have length to width (L:W) ratios varying from 1:1 (square) to over 30:1 (plug flow). The L:W ratio of an aeration basin directly ...
Read Full Article